![]() Now, the leaves are beautiful colors and, come spring, pink lady slipper flowers can be seen along the trail. The most scenic section of the first leg is in between Gold Mine Park and Whitehead Road. The use of golf carts, motorcycles or anything motorized is prohibited along the greenway. The trail is entirely paved or has bridges across areas where pavement is not possible, making the trail accessible to pedestrians, bicyclists, wheelchair users and joggers. Robinson Park North and South and Gold Mine Park, which will open soon. The land being leased was originally part of a failed plan to construct a new interstate called the Northern Loop.Īlong the first leg, visitors can park their cars at several spots to enter the trail, including downtown Sugar Hill along West Broad Street, at both E. The city purchased some of the land that is being used for the greenway, while the other parcels are being leased from the state. The greenway is a project that has long been in the works as formal plans were drawn up in 2016. The trail crosses over Level Creek Road at Gold Mine Park and then cuts over to Whitehead Road ending the first 4.5 mile section at Bethany United Methodist Church. From there, it continues south along Peachtree Industrial Boulevard before turning west back toward Level Creek Road. ![]() Then, it runs to Peachtree Industrial Boulevard to E. The first leg of the greenway is 4.5 miles long and runs from the downtown area up Level Creek Road to E. The first leg of the 16.5-mile planned greenway is open to the public, and it is peaceful and beautiful. The Sugar Hill Greenway offers a way to get outside and immerse oneself in nature in the heart of Sugar Hill.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |